Last week we installed the new bulk cryogenic tank and vaporizer system and tied it into our new 2”, 316L stainless steel distribution header. The system was leak tested and trial runs of the system showed it meets all design specification for flow and pressure drop and gas temperature at full flow. This week we started the installation of the new work benches and the 316L stainless steel distribution lines for the other calibration gases which will be piped to each work station.
Tank Delivery Tank Installation
Piping System Hook Up New Work Stations
Lawrence and Wayne Brad and Tim