Coastal Instruments – Mass Flow Controller Specialists
Coastal Instruments Mass Flow Controller Specialists SINCE 1980
  • Home
  • About Us
    • About Us
    • Location
      • Burgaw, North Carolina
  • Products
    • Product Matrix
    • Connectors and Adapters
    • Power Supply
    • Aalborg
    • AERA-AdvancedEnergy
    • Alicat
    • AppliedMaterials
    • ASM-Qualiflow
    • BOC-Edwards-Datametrics
    • Brooks-Emcore
    • Burkert
    • Hastings
    • Hitachi-SAM
    • MKS
    • PFD
    • Porter
    • Porter-Bronkhorst
    • Sierra-Omega-Kobold-Matheson
    • STEC-Horiba
    • Tylan-Millipore-Mykrolis
    • Unit-Kinetics-Celerity
  • News
    • Current News
    • Exhibitions
  • Resources
    • Industry Links
    • MFC Tutorial
      • Theory of Operation
      • Operating Environment
      • Contamination
      • Problems with Generic MFCs
      • Problems with MFC Mounting Positions
      • Pressure and Your Mass Flow Controller
      • Gas Distribution System
      • What You Should Know About Valve Closure
    • Connector Types
    • Connectors and Adapters
    • Repair Tag
  • Service
    • Accredited Calibration Service
    • Calibration Policy / Quality Statement
    • Certificate of Calibration
    • Repair Tag
    • Rotameter
    • Service Levels
    • Services Provided by Coastal Instruments
    • Warranty
  • Sales
  • Contact
  • Facebook

Memorial Day Holiday

Our office will be closed Monday, May 31, 2021 for the holiday.

Good Friday Holiday

Our office will be closed Friday, April 2, 2021.

Holiday Schedule

Our office will be closed for the holidays, December 21-25, 2020 and January 1, 2021.

Thanksgiving Holiday Schedule

Our office will be closed November 26-27 for the Thanksgiving Holiday.

ISO 17025 Audit Completed

Congratulations to the entire Coastal Instruments team for the successful completion of the Biennial Audit by A2LA (The American Association of Laboratory Accreditation) to the stringent requirements of ISO/IEC 17025-2017 and ANSI/NCSL Z540-1-1994. This audit covers all aspects of our quality system and certifies our compliance under the Testing and Calibration Laboratory classification. Congratulations on a great job!

Storm update

We have resumed normal operations after Hurricane I. Thanks for your patience during our outage.

Storm Aftermath

After the storm passed through here last night we are without power this morning. We hope to be back in operation as soon as we have power restored. In the meantime our phone systems are down as well so please be patient if you are trying to contact us today. We will post the details when we are able to get back in operation.

July 4th Holiday

Our office will be closed Friday, July 3, 2020.

Memorial Day Holiday

Our office will be closed Monday, 5/25/20.

Good Friday Holiday

Our office will be closed Friday, April 10, 2020.

...3456...10...
800-MFC-HELP
Copyright © 2023 Coastal Instruments. All Rights Reserved