Coastal Instruments – Mass Flow Controller Specialists
Coastal Instruments Mass Flow Controller Specialists SINCE 1980
  • Home
  • About Us
    • About Us
    • Location
      • Burgaw, North Carolina
  • Products
    • Product Matrix
    • Connectors and Adapters
    • Power Supply
    • Aalborg
    • AERA-AdvancedEnergy
    • Alicat
    • AppliedMaterials
    • ASM-Qualiflow
    • BOC-Edwards-Datametrics
    • Brooks-Emcore
    • Burkert
    • Hastings
    • Hitachi-SAM
    • MKS
    • PFD
    • Porter
    • Porter-Bronkhorst
    • Sierra-Omega-Kobold-Matheson
    • STEC-Horiba
    • Tylan-Millipore-Mykrolis
    • Unit-Kinetics-Celerity
  • News
    • Current News
    • Exhibitions
  • Resources
    • Industry Links
    • MFC Tutorial
      • Theory of Operation
      • Operating Environment
      • Contamination
      • Problems with Generic MFCs
      • Problems with MFC Mounting Positions
      • Pressure and Your Mass Flow Controller
      • Gas Distribution System
      • What You Should Know About Valve Closure
    • Connector Types
    • Connectors and Adapters
    • Repair Tag
  • Service
    • Accredited Calibration Service
    • Calibration Policy / Quality Statement
    • Certificate of Calibration
    • Repair Tag
    • Rotameter
    • Service Levels
    • Services Provided by Coastal Instruments
    • Warranty
  • Sales
  • Contact
  • Facebook

Hurricane Schedule Update

September 4, 2019|Mass Flow Controller News
Home » Mass Flow Controller News » Hurricane Schedule Update

In anticipation of the arrival of Hurricane Dorian our office will be closed Thursday and Friday, 9/5-6. During the shutdown period it is likely that the power and internet will be out and the phone systems, including cell service, will not be operating. We plan to resume full operations on Monday morning, 9/9/19, assuming power is available.

September 4, 2019 bob
← Hurricane Schedule
Thanksgiving Holiday →
800-MFC-HELP
Copyright © 2023 Coastal Instruments. All Rights Reserved